Build-Ready Scope Grader
Most software projects do not fail in code. They fail in the decisions that were never made. Score your project’s readiness, see the decisions blocking the build, and put a number on the cost of scope ambiguity.
What are you building?
The archetype sets the base planning band. It does not change your score.
Budget and timeline
Used to compare your expectation with the planning range. Optional.
The decisions behind the build
Answer honestly. A low score is useful; a flattering score is not.
0 of 16 answered
Your report unlocks when all 16 questions are answered.
Related reading
What to fix before you run the numbers
The score tells you where the scope is thin. These pieces explain what good looks like in the areas the tool flags most often.
- How to Write Software Requirements That Work A practical guide to writing software requirements: what to include, how to make them testable, and the mistakes that cause expensive rework. Read
- PRD vs SRS vs BRD: What Is the Difference? PRD vs SRS vs BRD explained: what each document answers, who owns it, when you need which, how they relate, and a lightweight approach that works. Read
- How to Estimate Software Development Project Cost Software estimation is notoriously difficult. Learn estimation techniques, common mistakes, and how to improve accuracy for your next project. Read
How the score and the estimate work
The tool is deliberately transparent. It is a planning instrument, not a quotation, and not an audit. Here is exactly what it does.
The readiness score
Sixteen questions are scored 0–4 and grouped into nine weighted dimensions. The weights are problem and outcome 15%, scope boundaries 15%, functional depth 15%, users 10%, non-functional requirements 10%, integrations and data 10%, decision rights 10%, delivery controls 10%, and compliance 5%. The weighted result is a score from 0 to 100.
Bands: Exposed 0–39, Developing 40–69, Build-Ready 70–100.
The planning range
Each archetype has a base planning band. The model adds a contingency that falls as readiness
rises: clamp(60% − 0.5 pp × score, 10%, 60%),
where score is 0–100. The result is the planning range. The contingency portion is reported separately as the cost of ambiguity.
Base bands are anchored to published market data, including Clutch’s 2026 pricing guide (average project around $132k over about 13 months; mid-market custom software commonly $75k–$250k; MVP work from $25k). Maintenance is budgeted at 15–25% of build cost per year. See our software cost guide.
What it is not
- Not a quotation. A quote needs a defined scope and a commercial conversation.
- Not a technical audit. It does not inspect code, infrastructure, or contracts.
- Not a guarantee. It is a structured way to expose the decisions that usually drive cost.
Your data
The full report is visible without an email address. Completed assessments are stored as anonymized records: archetype, answer codes, dimension scores, aggregate score, budget band, timeline band, and a random completion id. No name, email address, IP address, or free-text description is stored in that record.
The aggregated dataset is public: dataset.json. The report URL contains only the assessment state, never personal data.
Questions about the grader
What is the Build-Ready Scope Grader?
It is a free assessment that scores how ready a software project is to build. Sixteen questions across nine dimensions produce a 0–100 readiness score, a risk breakdown, the decisions blocking the build, a modeled cost of scope ambiguity, a planning range, and a five-year total cost of ownership estimate.
How is the readiness score calculated?
Each question is scored from 0 to 4. Questions are grouped into nine weighted dimensions: problem and outcome (15%), scope boundaries (15%), functional depth (15%), users and use cases (10%), non-functional requirements (10%), integrations and data (10%), decision rights (10%), delivery controls (10%), and compliance and risk (5%). The weighted result is a score from 0 to 100. The model is methodology v1.
Is the planning range a quote?
No. It is a planning range, not a quotation. Base bands are anchored to published market data and adjusted by your readiness score. A quote requires a defined scope, a delivery model, and a commercial conversation. The tool is designed to show you the size of the uncertainty before you ask for a fixed price.
What is the cost of ambiguity?
It is a modeled contingency. At lower readiness scores the model applies a larger contingency to the base planning band, representing the work that unclear scope usually adds. It is not a measured statistic and it is not a discount. It is a way to put a number on the decisions that are still open.
Do I have to give my email address?
No. The full report is visible without an email address. The email field only sends you the report and its permanent link. There is no account, no newsletter, and no sequence.
Can I continue later or share the report?
Yes. Every answer is encoded in the report URL. Open the link later to continue, change an answer, or share the report with a teammate. The URL contains the assessment state only — never your name or email address.
What data do you store?
Completed assessments are stored as anonymized records: project archetype, answer codes, dimension scores, aggregate score, budget band, timeline band, and a random completion id. No name, email address, IP address, or free-text description is stored in that record. The aggregated dataset is published as JSON for anyone to cite.
